govt.gif (1262 bytes)


dep1.gif (886 bytes)

FORM-E

(Notice of commencement of stoping)
(See rule 26(2))
                                           MINE CODE__________
                                                  To
___________________________________               1. The Controller General
IMPORTANT                                            Indian Bureau of Mines,
Notice in ths Form shall be sent atleast sixty       Nagpur - 440 001
days before the commencement of stopping
operations to the concerned authority.            2. The Controller of Mines,
__________________________________                   Indian Bureau of Mines, 
                                                     PIN_________
                                                  3. The Reg.Controller of Mines
                                                     Indian Bureau of Mines,
                                                     PIN __________
                                                  4. State-Government concerned
1. (a) Name of mine            __________________________________
   (b) Section/pit number**    __________________________________
   (c) Mineral/minerals worked __________________________________
2. Name and address of
   (a) Owner                  ___________________________
   (b) Agent                  ___________________________
   (c) Manager                ___________________________
   (d) Mining Engineer/Geologist
       employed under rule 42 ___________________________
3. Date of expiry of lease: ___________________________________
4. Date on which it is proposed to commence stoping ______________________
5. Extent of development in the mine: _____________________________________
  (a) Number of shafts/inclines/and its
      width/depth/length                 _________________________________
  (b) Maximum depth and development      __________________________________
  (c) Number of levels with their extent __________________________________
  (d) Total meterage of development      __________________________________
  (e) Total number of blocks developed including
      the total tonnage and grade (excluding blocks
      already stoped out and already permitted for stoping)
6. Details of the blocks applied for stoping
(a) Number and size of each block,
    their levels tonnage and grade        _________________________________
(b) Method of stoping to be adopted -
(i) A description of the method with
    apprropriate drawings to illustrate the
    stope preparation sequence of operation
    and extraction                       __________________________________
(ii)Rate of stoping contemplated
    in each block (monthly)              ___________________________________
(iii)Estimated recovery from
     each block                         ____________________________________
(iv) Estimated dilution                 ____________________________________
 (v) Estimated tonnage and grade
     of ore to be extracted            _____________________________________
7. Is this a first application for stoping for this mine?
   If not, the following details may be furnished.
   (i) Date of previous application(s) for stoping: ___________________________
  (ii) Date and reference of permission or 
       refusal by this department (mention
       blocks and their levels)                    ____________________________
(iii) Have all the blocks for which stoping permisssion was granted, been
      stoped out? If not, mention the specific blocks that are remaining
      to be stoped out, indicating the state of stoping operations 
      therein:                                    _____________________________
8. Rate of development and programme of forming additional stope blocks simul-
   taneously with the proposed stoping. ____________________________________
9. List of enclosures                   ____________________________________
Place:	                                            Signature
Date:                                               Name in full:
                                                    Designation:Owner/Agent/
                                                    Mining Engineer/Manager
________________________________________________________________________________
Note: Information in respect of items 5 and 6(a) should be accompanied 
by (I) underground composit plan, (ii) longitudinal section, (iii)
geological/assay plan of the levels at which stoping is proposed 
includingone level above and below , and (iv) transverse sections 
at reasonable intervals for the portion covered under (iii) above.

 

* This should be sent to the Controller of Mines/Regional Controller
 of Mines in whose territorial jurisdiction the area/mine falls as
 notified from time to time by the Controller General, Indian Bureau of Mines,
 under rule 62 of the Mineral Conservation and Development Rules, 1988.
** This is applicable in cases where the main mine is divided into more than
 one district/section/pit.